(Selçuk-Ödemiş)Ayr. – İncirliova İl Yolu
Engineering and design services for 46 km long Incirliova Road that starts from Selcuk - Odemis Road:
Production of 47.01 km 1/1000 Scale Digital Mapping with Photogrammetric Method,
Production of Final Project (32.01 km),
32.01 km Geotechnical Investigation and Engineering Services,
Production of 32.01 km Traffic Design Project,
Production of 1 Bridge Design Project (611 m²).
Production of 47.01 km 1/1000 Scale Digital Mapping with Photogrammetric Method,
Production of Final Project (32.01 km),
32.01 km Geotechnical Investigation and Engineering Services,
Production of 32.01 km Traffic Design Project,
Production of 1 Bridge Design Project (611 m²).
Scope of Service
Design Engineering
Location
Türkiye
Administration
Program and Monitoring Department Other Special Budget Institutions
General Directorate of Highways
Period