Detailed Design and Consultancy Services of Aksaray – Kayseri Double Track High Speed Train Project

Detailed Design and Consultancy Services of Aksaray – Kayseri Double Track High Speed Train Project

Within the scope of Detailed Design and Consultancy Services of Aksaray – Kayseri Double Track High Speed Train Project, the services of survey, project, engineering and consultancy of the works listed below have been carried out:
[●] 149,09 km. double-track high speed railway project (Route Corridor Survey, Preliminary Design, Detailed Design, Superstructure Design and Detailed Drainage Design)
[●] Hydrological and hydraulic surveys and reporting
[●] 149,09 km. ground investigation engineering services
[●] For the route with a length of 149,09 km, preparation of ground control points and obtaining base maps
[●] Artwork projects designed on the route (Bridges, Underpasses, Overpasses and Culverts)
[●] Minor Artworks Design (195 Culverts, 80 Underpasses, 31 Agricultural Underpasses, 1 State Railway Underpass, 38 Overpasses)
[●] Detailed Design of 7 Bridges (307.72 m long in total)
[●] Detailed Design of 10 Viaducts (6,117.51 m long in total)
[●] Detailed Design of 9 Tunnels (11,296.55 m long in total)
[●] Detailed Design of 14 Cut-and-Cover Tunnels (3,829.87 m long in total)

Scope of Service

Design engineering

Location

Türkiye

Employer/Administration

GENERAL DIRECTORATE OF STATE RAILWAYS (TCDD) GENERAL DIRECTORATE