Ankara-Sivas Railroad Project Construction Supervision and Consultancy Services for Infrastructure Replenishment Works Between Yerköy-Yozgat-Sivas (Section II Km: 332+300-363+527, 727)

Ankara-Sivas Railroad Project Construction Supervision and Consultancy Services for Infrastructure Replenishment Works Between Yerköy-Yozgat-Sivas (Section II Km: 332+300-363+527, 727)

- Supervision of infrastructure works of dual-track high speed train with operating speed of 250 km/h
- Supervision of 2 ea. 2.578,00 m tunnel construction,
- Supervision of 6 ea. 2097,5 m viaduct construction,
- Supervision of 5 ea. overpass construction,
- Supervision of 11 ea. underpass construction,
- Supervision of 1 ea. bridge construction,
- Supervision of 1 ea. total cut-and-cover construction,
- Supervision of 52 ea. culvert construction,
- Supervision of 21.201.008,16 m3 excavation manufacture,
- Supervision of 3.727.117,00 m3 backfill manufacture,
- 4997 m3 subbase layer supervision, 4428 m3 base layer supervision, 30.635 m2 surface treatment supervision for highway (infrastructure and superstructure) displacement,
- Supervision of infrastructure works of dual-track high speed train with operating speed of 250 km/h

Scope of Service

Supervision and Consultancy

Location

Türkiye

Administration

REPUBLIC OF TURKEY DIRECTORATE GENERAL OF STATE RAILWAYS (TCDD) RAILROAD CONSTRUCTION DEPARTMENT

Period