Ayr- Bitlis 9. Bl. Hd. Yolu

Ayr- Bitlis 9. Bl. Hd. Yolu

Study, Design and Engineering Services Job for Construction Works for "soil leveling works, engineering structures, sub base, base, bitumen hot mixture, surface coating stone chip supply, bridge and tunnel, etc.)" between Km: 0+123 - 6+450 and Km: 0+000 - 49 + 853 of Junc. - Bitlis 9. Bl. Hd. Road (Bitlis City crossing included)
1) Preparation of photogrammetric Map (3150 ha)
2) Making application (48.116 km)
3) Making bridge designs
- Pre-tensioned bridge (in different clearings, 27 ea.)
- Bitlis Creek Viaduct (Balanced Console Bridge, central clearing 140 m, length L = 591 m, width E = 19.60 m + Push - Slide Bridge, calculation clearing 48 m, length L = 801 m, width E= 19.60 m - Total Length : 1392 m); a total of 29 bridges - design calculation area = 19183 m2
4) Road Design Development (58 km)
5) Topographic Map preparation (285 ha)
6) Expropriation plan preparation (47 km)
7) Preparation of tunnel designs
- 8 Ağustos Tunnel (L average = 1947 m - dual tube)
- Tunnel T2 (L = 329 m single tube) - Tunnel T3 (L = 383 m single tube)
Tunnel T4 (L = 232 m single tube) - Tunnel T5 (L = 161 m single tube)
8) Survey Engineering Services Works (including boring, geo physics, laboratory and reporting works, bridge geo technical reports preparation)

Scope of Service

Design Engineering

Location

Turkey

Employer/Administration

General Directorate of Highways

Period

yalova escort,yalova,eskort