Çaycuma-Bartın Junc.-Hisarönü-Zonguldak Road 6 Tunnels, Engineering Structures and Route Application Projects Preparation, Survey, Project Consultancy Service Procurement Work
-Procurement of 1/1000 scaled base map (294.60 ha.),
-Preparation of Km: 0+000- 4+970 Final Design Projects (2x2 State Road),
-Preparation of Km: 0+000- 4+970 Drainage Design Projects (2x2 State Road),
-Preparation of 5 grade separated junctions, 3 at grade junctions,
-Execution of Km: 0+000- 4+970 Boreholes on-site experiments and laboratory works,
-Drawing up Km: 0+000 — 4+970 Geologic and Geotechnics reports,
-Drawing up Km: 0+000- 4+970 Superstructure report,
-Drawing up Km: 0+000- 4+970 Geotechnics report,
-Preparation of Main Road Bridge K1 (0+695.34-0+904.66) L=209.32 m construction drawings
-Preparation of Main Road Bridge K2 (3+341.94-3+381.94) L=40 m construction drawings,
-Preparation of Overpass Bridge (0+162-0+260.04) L=97.80 m construction drawings,
-Preparation of Overpass Bridge (0+080.79-0+127.38) L=46.60 m construction drawings
-T1 (5+ 1 80-7+850) L = 2670 m, preparation of tunnel final design projects (dual tube), via NATM
-T2 (7+970-8+380) L = 410 m, preparation of tunnel final design projects (dual tube), via NATM,
-T3 (8+670-9+400) L = 730 m, preparation of tunnel final design projects (dual tube), via NATM,
-T6 (13+745-15+410) L = 1665 m, preparation of tunnel final design projects (dual tube), via NATM,
-T7 (21+200-23+160) L = 1960 m, preparation of tunnel final design projects (dual lube), via NATM,
-T8 (23+560-25+205) L = 645 m, preparation of tunnel final design projects (dual tube), via NATM,
-Preparation of bills of quantities
-Preparation of Km: 0+000- 4+970 Final Design Projects (2x2 State Road),
-Preparation of Km: 0+000- 4+970 Drainage Design Projects (2x2 State Road),
-Preparation of 5 grade separated junctions, 3 at grade junctions,
-Execution of Km: 0+000- 4+970 Boreholes on-site experiments and laboratory works,
-Drawing up Km: 0+000 — 4+970 Geologic and Geotechnics reports,
-Drawing up Km: 0+000- 4+970 Superstructure report,
-Drawing up Km: 0+000- 4+970 Geotechnics report,
-Preparation of Main Road Bridge K1 (0+695.34-0+904.66) L=209.32 m construction drawings
-Preparation of Main Road Bridge K2 (3+341.94-3+381.94) L=40 m construction drawings,
-Preparation of Overpass Bridge (0+162-0+260.04) L=97.80 m construction drawings,
-Preparation of Overpass Bridge (0+080.79-0+127.38) L=46.60 m construction drawings
-T1 (5+ 1 80-7+850) L = 2670 m, preparation of tunnel final design projects (dual tube), via NATM
-T2 (7+970-8+380) L = 410 m, preparation of tunnel final design projects (dual tube), via NATM,
-T3 (8+670-9+400) L = 730 m, preparation of tunnel final design projects (dual tube), via NATM,
-T6 (13+745-15+410) L = 1665 m, preparation of tunnel final design projects (dual tube), via NATM,
-T7 (21+200-23+160) L = 1960 m, preparation of tunnel final design projects (dual lube), via NATM,
-T8 (23+560-25+205) L = 645 m, preparation of tunnel final design projects (dual tube), via NATM,
-Preparation of bills of quantities