Detailed design of the 12 km long Erbil Ring Road, including preparation of topography map, preparation of cross-sections of the field, Hydraulic Survey, Field Inspections (Drilling, Field and Laboratory Tests) and Reporting, road design, design of 4 pre-stressed bridges and two interchanges and Preparation of Tender Documents.