Finike – Demre Road Survey and Project Consultancy Service Procurement Work

Finike – Demre Road Survey and Project Consultancy Service Procurement Work

• Preparation of 38.16 kilometers long Corridor Survey, • Preparation of 38.16 kilometers long (1322.70 hectare area) 1/1000 Scale Terrestrial Map (ground surveying method & Terrestrial Ecosystem Mapping (TEM)), • Preparation of 38.16 kilometers long Final Design Project, • Preparation of 38.16 kilometers long Traffic Design Project, • Preparation of 38.16 kilometers long Geotechnical Investigation and Engineering Services Work, • Preparation of 38.16 kilometers long (25,912.65 square meters) Bridge Design Project.

Scope of Service

Design Engineering

Location

Türkiye

Administration

Department of Programme and Monitoring
Other Special Budget Instıtutions

General Directorate of Highways

Period

Zonguldak escort