Konya – Aksaray Demiryolu Etüt, Proje, Mühendislik ve Danışmanlık Hizmeti Alımı
• 140.665 km dual track high speed train project (Route Corridor Survey, Preliminary Project, Superstructure Project and Drainage Project)
• Hydrological and hydraulic survey and reporting
• 140.665 km soil survey engineering services
• Preparation of ground control points and procurement of base maps for 140.665 km long route
• Projects for the engineering structures (bridge, underpass, overpass and culverts) designed on the route;
• 3 (187.50 meters in total) bridge projects
• 1 (408.40 meters in total) box structure project
• 1 (464.30 meters in total) cut-and-cover project
• 1 (4590 meters in total) tunnel project
• Drafting of 140.665 km Expropriation Plan and Documentation
• Drafting of EIA Report
• Drafting of estimates, bill of quantities and civil works tender documentation
Scope of Service
Design engineering
Location
Turkey
Employer/Administration
T.C. Devlet Demiryolları İşletmesi Genel Müdürlüğü (TCDD) Genel Müdürlük
Period