Salihli – Manisa Railway Survey, Project, Engineering, and Consultancy Services

Salihli – Manisa Railway

In the scope of to Salihli – Manisa double track high speed railway project;
• Double track high speed railway of 75.98 km,
• Ground survey study services of 75.98 km,
• Purchase of a 1/2000 scaled photogrammetric map of 75.98 km,
• Preparation of expropriation plans of 75.98 km,
• Preparation of architectural, static, electrical, and mechanical projects belonging to 3 high-speed railway station,
• 1 post-stressed viaduct project of 1,129 m,
• 1 pre-stressed viaduct project of 310 m,
• 17 bridge projects of 867.5 m,
• 2 units of 8x8 box sectioned state railways passage,
• 42 underpasses,
• 39 overpasses,
• 146 culverts,
• Preparation of the EIA report, and
• Preparation of the survey, the bill of quantities, and the tender documents

Scope of Service

Design engineering

Location

Türkiye

Employer/Administration

Republic of Tükiye
General Directorate of State Railways,
Head Department of Railway Construction