Zonguldak Ring Road Survey and Project Consultancy Service Work
Zonguldak Ring Road Survey and Project Consultancy Service Work
Execution of Corridor Survey for 13.5 km;
Production of 13.5 km. (252 Ha.) 1/1000 Scaled Digital (Terrestrial) Map
Production of 13.5 km final design project
Production of 13.5 km Traffic Design Project
Execution of Survey Engineering Services for 13.5 km.
Production of (9,343.23m2) 3 Bridge Projects
Production of 6 (L=9,637.0m) Dual-Tube Tunnel Projects
Production of 13.5 km. (252 Ha.) 1/1000 Scaled Digital (Terrestrial) Map
Production of 13.5 km final design project
Production of 13.5 km Traffic Design Project
Execution of Survey Engineering Services for 13.5 km.
Production of (9,343.23m2) 3 Bridge Projects
Production of 6 (L=9,637.0m) Dual-Tube Tunnel Projects
Scope of Service
Design Engineering
Location
Türkiye
Administration
Department of Programme and Monitoring
Other Special Budget Institutions
General Directorate of Highways
Period